Ongoing & Past Projects

Tensile & Permanent Elongation Test on mechanical splicing & coupler System

Leviat

Regular testing on the material included PC Strand, Coupler, Rebars, for the concrete precast products manufacturing.

Eastern Pretech Sdn Bhd

Tensile & Modulus of Elasticity on Prestressed Concrete Strand (PC Strand)
Engtex

Structural Integrity Assessment & Soil Investigation works on their project development
GMart Motor Group

Continuous testing for various project site across Malaysia
Kitacon Sdn Bhd

Settlement monitoring for Sime Darby Project Site, Gamuda Cove on the backfilling and surcharge phase.
Yau Poh Trading Sdn Bhd

25 Exploratory Borehole on the Flood Mitigation project, Segamat.
Kemuncak Pusaka

To install ICCP for cathodic protection at power plant with advanced sacrifial method.
UBF Group, Melaka Power Plant

Carried out the DASH CA4 package for material, field testing for DASH Highway roadwork development.
Sinar Widuri Sdn Bhd

To supply kentledge and carried out Maintained Load Test for settlement monitoring, numerous continuous testing for various projects & developments in Klang Valley.
TCS Construction Sdn Bhd

Performed site testing to ensure product quality & material testing which included PC Strand, Coupler, Rebars, for the concrete precast products manufacturing.
Concrete Empire Sdn Bhd

carried out various testing to facilitate project development for Eng Han Group.
Eng Han Group

Performed pullout test & material testing to facilitate the project development.
MyArch Group

Carried out exploratory Borehole to facilitate the development of Delloyd Group.
Delloyd Group

Paragon Pinacle

EcoWorld group

Contact Us

Shah Alam: +60 -7859 9246

Semenyih: +603 - 8723 9300

+60 16-201 5612

57, Jalan Zuhrah BH U5/BH, Subang Murni, Seksyen U5, 40150 Shah Alam, Selangor